Pipeline Survey & Right of Way Projects

 

8" Pipeline As-Built Survey - West Texas

 

Swift Surveying completed a ROW survey and staking of a 14 mile pipeline located in the Permian Basin. Our team staked the proposed pipeline route and created all the easement drawings and legal descriptions for the pipeline route.The final deliverables included as-built drawings, shapefiles, weld map and talley sheets.

 

24" Pipeline As-Built Survey - South Texas

 

Our team completed the preliminary and as-built survey of a 24" pipeline in south Texas. Swift surveying was hired to complete the staking and as-built survey for this project. 

 

Facility Site Layout & As-Built Survey

 

Our team performed a layout and as-built surveys of 3 oil & gas facility site near Orla, Texas.  Swift Surveying Company staked the proposed facility and located any foreign pipelines in the area.  We also conducted an as-built survey of the facility site and pipelines once the site was finished. Deliverables included AuoCAD drawings of the facitlity, boundary survey, legal descriptions, and ESRI shapefiles. 

42 Mile 10" & 16" Pipeline As-Built Survey

 

Swift Surveying performed a hydrographic and land as-built survey on a 10" & 16” pipeline. This survey was conducted to ensure the pipeline met all Texas Railroad Commission regulatory standards for coverage and to record a precise location of the pipeline. Deliverables includes as-built drawings, talley sheets, weld map and GIS shapefiles.

 

 

12 Mile - 8" Pipeline Right of Way Staking & Staking

 

Swift Surveying completed a ROW survey and staking of a 12 mile pipeline located in the Eagle Ford Shale area. Our team staked the proposed pipeline route.  We completed the pipeline as-built survey as the pipeline was layed. The final deliverables included as-built drawings and talley sheets.

 

16" Pipeline Depth of Burial Survey - Gulf of Mexico

 

Swift Surveying Company conducted a depth of cover survey for a 16" pipeline from Matagorda Island, Texas to a nearshore oil rig in the Gulf of Mexico.  The survey was completed using a sub-bottom profiler, magnetometer, DGPS, and echosounder.  This survey was conducted to ensure the pipeline meet all depth of burial requirements for the Texas Railroad Commission. The client deliverables included shapefiles and as-built drawings.

 

4" Pipeline As-built Survey

 

Swift Surveying performed a hydrographic and land as-built survey on a 4” pipeline. This survey was conducted to ensure the pipeline met all Texas Railroad Commission regulatory standards for depth of burial and to record a precise location of the pipeline. Deliverables included as-built drawings and GIS shapefiles.